Our Standards
Quality Control
5-Step Inspection
- 01. Incoming Material
Steel grade, thickness, surface quality verified before production - 02. First Article Inspection
Complete dimensional check on the first piece of every run - 03. In-Process Sampling
Random checks at cutting, forming, welding, and coating stages - 04. Final Inspection
100% visual check plus AQL-based dimensional spot-checks - 05. Pre-Shipment Audit
Final verification against your specifications before loading
Testing Equipment
- • CMM (Coordinate Measuring Machine)
- • Digital coating thickness gauge
- • Salt spray corrosion test chamber
- • Weld integrity inspection tools
- • Load and strength testing equipment
If anything does not meet specification, we fix it or replace it.
