Our Standards

Quality Control

5-Step Inspection

  1. 01. Incoming Material
    Steel grade, thickness, surface quality verified before production
  2. 02. First Article Inspection
    Complete dimensional check on the first piece of every run
  3. 03. In-Process Sampling
    Random checks at cutting, forming, welding, and coating stages
  4. 04. Final Inspection
    100% visual check plus AQL-based dimensional spot-checks
  5. 05. Pre-Shipment Audit
    Final verification against your specifications before loading

Testing Equipment

  • • CMM (Coordinate Measuring Machine)
  • • Digital coating thickness gauge
  • • Salt spray corrosion test chamber
  • • Weld integrity inspection tools
  • • Load and strength testing equipment

If anything does not meet specification, we fix it or replace it.